UPDATE - MARCH 7th, 2011

THE PROJECT IS ON SCHEDULE AND PROCEEDING VERY WELL.

THE 3rd FLOOR IS NEARING COMPLETION, WITH SUITES PAINTED,
CEILINGS STIPLED, CABINETS INSTALLED, ELECTRICAL OUTLETS
INSTALLED.  FLOORING WILL START ON MONDAY, MARCH 14th

THE SECOND FLOOR IS CURRENTLY BEING PAINTED AND THE MAIN
FLOOR IS BEING DRYWALLED.

THE ELEVATOR IS 85% COMPLETE. 

HEATING UNITS WILL START TO BE INSTALLED NEXT WEEK AS WILL
PLUMBING FIXTURES.  DOORS AND MOLDINGS ARE BEING INSTALLED.

FOLLOWING ARE PICTURES IN NO PARTICULAR ORDER

BATHROOM VANITY



CUPBOARDS IN 2 BR




ADJUSTABLE SHELVES AND ROD IN
CLOTHES CLOSET

BATHROOM VANITY







DOORS ARE BEING HUNG



ELEVATOR ON MAIN FLOOR




HALLWAY ON 3rd FLOOR


KITCHEN IN 1 BR


















HALLWAY ON MAIN FLOOR








PANTRY IN 2 BR









SUITE ON MAIN FLOOR


MARCH 7th, 2011