UPDATE - APRIL 26th, 2011



THESE PICTURES WERE TAKEN OVER A FEW DAYS
THE VIRDEN CENTENNIAL HOUSING CORP
HAD A TOUR LAST WEEK AND
THEN A FEW PICTURES ON THE
WEEKEND AND TODAY


COMMON ROOM

$



ELEVATOR ON MAIN FLOOR


NEW ENTRANCE DOOR TO A SUITE





FIREPLACE IN THE COMMON ROOM


FRONT ENTRANCE TO THE BUILDING




SUITE FURNACE THAT IS LOCATED
IN A ROOM ON THE BALCONY


WORK ON THE WEEKEND TO GET
READY TO STUCCO



WELL LIT HALLS AND NOTICE
THE HAND RAIL




JIM LYONS AND PAUL ROCAN
INSPECT ONE OF THE NEWLY INSTALLE
ENTRANCE DOORS





SOME OF THE VCHC BOARD OF DIRECTORS


VIEW FROM THE REAR OF THE BUILDING

Thursday, April 14, 2011

UPDATE - APRIL 13th




KITCHEN ON 3rd WITH LIGHT






AND THEN THERE WAS LIGHT



BATHROOM LIGHTS


BEDROOM CLOSET DOORS AND VALENCE


LIGHT IN BEDROOM


DISHWASHER INSTALLED ON 3rd


COLD AIR RETURN


FRONT ENTRANCE OF SUITE






FEATURE WALL IN SUITE





FRONT ENTRANCE LIGHT


HALLWAY LIGHT


HALLWAY ON MAIN FLOOR


HEATING VENT


KITCHEN ON MAIN FLOOR


FIREPLACE IS INSTALLED


INSTALLING FRONT ENTRANCE DOORS



KITCHEN ON MAIN FLOOR


LIGHT IN STORAGE ROOM

Friday, April 8, 2011

UPDATE - APRIL 6th, 2011

ON APRIL 6th, WE HAD ANOTHER SITE MEETING
CONSTRUCTION IS PROCEEDING VERY WELL
AND EVERYTHING APPEARS ON OR CLOSE
TO SCHEDULE

FOLLOWING ARE RANDOM SHOTS FROM AROUNG THE
BUILDING

NEW RANGE HOOD AND SINK



BASEBOARDS


ONE BR KITCHEN


COMMON AREA ON MAIN FLOOR




FRONT ROOM LOOKING OUT TO BALCONY


2BR KITCHEN AND FRONT DOOR


1 BR KITCHEN


2 BR KITCHEN


LIGHT OVER DINING AREA


NEW STAIRS


OAK FRONT DOORS TO SUITES


RANGE HOOD


NEW SINK WITH PLASTIC STRAINER


MEMBERS OF BUILDING COMMITTEE


TOILET AND VANITY


GRAB BARS IN BATHTUB