COMPLETION IS ON SCHEDULE. THE 3rd FLOOR IS NOW DRYWALLED
AND WORK CONTINUES ON THE 2nd FLOOR. THE ELEVATOR WILL
BE INSTALLED IN EARLY FEBRUARY.
BATHTUB
GIANT ELECTRICAL PANEL
IN THE MECHANICAL ROOM
ELEVATOR SHAFT
JIM LYONS AND LESTER THIESSEN
IN THE FOYER ON THE 3rd FLOOR
FRONT CLOSET
FRONT ROOM
3rd FLOOR HALL
ELECTRICAL PANEL
JIM AND LESTER
LIFTING DRYWALL INTO A SUITE
ON THE 2nd FLOOR
2 BR SUITE
VIEW LOOKING WEST
NEW WINDOWS IN THE FOYERS
ON THE 2nd & 3rd FLOORS
FRONT ROOM IN 1 BR SUITE