BOLTON PLACE SENIOR SUITES

BOLTON PLACE SENIOR SUITES

Tuesday, September 28, 2010

UPDATE - SEPT 28th

FALL IN VIRDEN
LOOKING DOWN THOMAS DRIVE


Sept 26th
Shingling almost complete


SEPT 27th


OUTDOOR PATIO
&
MECHANICAL ROOM


OUTDOOR PATIO AREA


WORKING ON BALCONY


SEPT 28th
ROOF COMPLETE


WEST SIDE OF BUILDING


WEST SIDE OF BUILDING
SEPT 28th

Friday, September 24, 2010

SUITE FLOOR PLANS

ONE BEDROOM SUITES


FEATURES

10 UNITS STILL AVAILABLE
640 sq ft, RENT CONTROLLED AT $565 / Mn
INDIVIDUALLY CONTROLLED HEAT AND COOLING
NO CONDO FEES - EVERYTHING INCLUDED
EXCEPT - TELEPHONE, CABLE AND INTERNET
WASHER / DRYING IN EACH UNIT
INDIVIDUAL PATIOs / BALCONIES
FULL KITCHENS
FRIDGE, STOVE DISHWASHER
PARKING FOR EACH UNIT FOR $20 - $30 / Mn


TWO BEDROOM SUITES


FEATURES

4 UNITS STILL AVAILABLE
( 1 BEING BARRIER FREE / ACCESSIBLE )
INDIVIDUALLY CONTROLLED HEAT AND COOLING
NO CONDO FEES - EVERYTHING INCLUDED
EXCEPT - TELEPHONE, CABLE AND INTERNET
WASHER / DRYER IN EACH UNIT
INDIVIDUAL PATIOs / BALCONIES
FULL KITCHENS
INCLUDES FRIDGE, STOVE AND DISHWASHER
PARKING FOR EACH UNIT $20 - $30 / Mn


SEPT 25th - UPDATE

DORMER SHINGLED



FRONT ENTRANCE


NEW BALCONIES


NEW ENTRANCE



Tuesday, September 21, 2010

UPDATE - SEPTEMBER 21st

STARTING TO SHINGLE
ON EAST SIDE - 10am


SHINGLING AT 2:00 pm




WEST SIDE OF BLDG
2:00 pm


WORKING ON ROOF
OF COVERED PATIO AREA


VIEW FROM HIGHWAY #83

Monday, September 20, 2010

UPDATE - SEPT 19th AND 20th

MONDAY SEPT 20th







SUNDAY SEPT 10th
WEST SIDE OF BUILDING


WEST SIDE



SOUTHEND OF BUILDING


BALCONIES AND POURED PATIOs


Saturday, September 18, 2010

SATURDAY, SEPT 18th - UPDATE

WORKING SATURDAY
TO START SHINGLING














Friday, September 17, 2010

SEPT 17th - UPDATE

 

Working on closing off the south
side of the building



Southeast end with some balconies in
place


Front entrance


Northeast end


Pouring concrete deck on
main floor

Wednesday, September 15, 2010

SEPT 15th - UPDATE


INSTALLING BRACKETS FOR DECKS &
SHEETING ON DORMERS


STREET LIGHTS ON BOLTON BAY



INSTALLING SHEETING ON STAIRWELL
ON SOUTH SIDE OF BUILDING




FRONT ENTRANCE - NOTICE
2 PILLARS



FRONT ROOM OF 2BR


LOOKING TOWARD BR IN
2BR SUITES


VIEW FROM THE 3RD FLOOR


VIEW FROM THE 3RD FLOOR