THE PROJECT IS PROCEEDING ON SCHEDULE.
PAINTING HAS STARTED ON THE 3RD FLOOR.  TWO COATS
WILL BE APPLIED AND THEN INTERIOR WORK WILL BE DONE.
FINALLY A FINISH COAT WILL BE APPLIED TO MAKE THE
SUITES, TENANT READY.

THE ELEVATOR WILL START TO BE INSTALLED NEXT MONDAY.


BRINGING MORE DRYWALL


HALLWAY ON THE MAIN FLOOR


SOME PAINTING THAT IS COMPLETE ON
3rd FLOOR


1 BR SUITE ON 3RD


2 BR SUITE ON 3rd FLOOR


BEDROOM



PAINTED BATHROOM


JIM AND LESTER


SHAFT FOR THE ELEVATOR


LOOKING BACK PAST ELEVATOR SHAFT
TO MAIN ENTRANCE


PAINTED KITCHEN


PAINTER, LESTER AND JIM
STUDY THE CEILING