THE PROJECT IS PROCEEDING ON SCHEDULE.
PAINTING HAS STARTED ON THE 3RD FLOOR. TWO COATS
WILL BE APPLIED AND THEN INTERIOR WORK WILL BE DONE.
FINALLY A FINISH COAT WILL BE APPLIED TO MAKE THE
SUITES, TENANT READY.
THE ELEVATOR WILL START TO BE INSTALLED NEXT MONDAY.
BRINGING MORE DRYWALL
HALLWAY ON THE MAIN FLOOR
SOME PAINTING THAT IS COMPLETE ON
3rd FLOOR
1 BR SUITE ON 3RD
2 BR SUITE ON 3rd FLOOR
BEDROOM
PAINTED BATHROOM
JIM AND LESTER
SHAFT FOR THE ELEVATOR
LOOKING BACK PAST ELEVATOR SHAFT
TO MAIN ENTRANCE
PAINTED KITCHEN
PAINTER, LESTER AND JIM
STUDY THE CEILING